SVRA Apron Rehabilitation

Project starts: 05/27/2014
Completion date: 07/15/2014
Estimated budget:  $538,204

Monthly Updates:

04/14/14
This project will reconstruct the old asphalt/concrete apron at the SVRA. The apron in this project was originally paved with concrete and later overlaid with asphalt. Work will include removing the existing asphalt surface by cold milling to the top of the old concrete (approximate depth of three inches), excavating the underlying concrete and stabilizing the sub-grade as necessary. New engineered fill material and a five inch thick asphalt surface source will be placed. The bid opening for this project was held on April 9, 2014. Bids are currently being evaluated.

05/14/14
This project will reconstruct the old asphalt/concrete apron at the SVRA. The apron in this project was originally paved with concrete and later overlaid with asphalt. Work will include removing the existing asphalt surface by cold milling to the top of the old concrete (approximate depth of three inches), excavating the underlying concrete and stabilizing the sub-grade as necessary. New engineered fill material and a five inch thick asphalt surface source will be placed. The bid opening for this project was held on April 9, 2014. Contract documents are currently being executed.

07/31/14
Substantial completion was issued on July 15, 2014 for this project. The Contractor is working on punch list items.

Space for Lease

SLCIA Space for Lease

Find information about available space for lease at Salt Lake City International Airport.


Fast Facts

SLCIA Fast Facts

Fast facts on Salt Lake City International Airport.